2011 Preventive Maintenance

The project involved a $0.875 million pavement rehabilitation along three city streets: Otis Street, University Avenue (pictured), and South Avenue. The project included development of striping plans and specifications to support the pavement rehabilitation along these city streets. Preliminary design activities included preparation of an accident analysis and development of concept striping layouts for each street. Final design activities included development of project plans which included typical sections, striping plans, work zone traffic control, details, cost estimates and specifications.  Other improvements include traffic signal loop replacements curbing resets, drainage structure adjustment, drainage system cleaning, sign upgrades, and sidewalk ramp improvements. Design included development of a road diet plan for University Avenue. The existing striping was modified from 4 travel lanes down to 2 travel lanes with shoulders and turn lanes at intersections. In addition to preparation of plans, specifications and contract documents, a NYSDOT highway work permit and a right-of-entry permit for a CSX rail crossing was obtained.

Project Details

Location

Rochester, NY

Owner

City of Rochester

Construction Cost

$875k

Project Contact

William McCormick, PE
  • William McCormick, PE
  • 585-427-8888 x 1080
Bookmark and Share