Districtwide Paving Analysis, Loxahatchee Groves Water Control District

This project required a report providing criteria, concepts, and cost estimates for the paving of the primary roadways within the Loxahatchee Groves Water Control District. Alternative pavement materials were presented and compared with the existing unpaved roadways to assess the feasibility and benefits of paving. Intersection configurations, drainage, and permitting requirements were also presented in the report. The report was presented to the LGWCD board of directors and the public at an open public involvement meeting. Additional funding concepts are being developed as part of the project. Property owner assessments were determined for construction of the roadways.

Project Details

Location

Loxahatchee, FL

Owner

Loxahatchee Groves Water Control District

Project Contact

James Noth, PE, PSM