Greenview Shores Turn Lane

Roadway design and engineering survey services were provided to the Village of Wellington for the addition of a turn lane at Greenview Shores and Paddock Drive. Erdman Anthony conducted a design survey of the Greenview Shores Boulevard corridor within the project limits (approximately 1,000 feet east and west of Paddock Drive). The survey located the pertinent topographic features and elevations in this area and established horizontal and vertical control for the contractor's use in construction of the proposed improvements. 

Project Details

Location

Wellington, FL

Owner

Village of Wellington

Construction Cost

$12.7k

Project Contact

James Noth, PE, PSM
  • James Noth, PE, PSM
  • 561-753-9723 x 6020
Bookmark and Share