Rochester Precision Optics

Erdman Anthony was the prime design firm in this design/build formatted project involving over $5,000,000 in facility renovations of an existing manufacturing building. The project had an extremely aggressive schedule which provided only 6 months from the time the contract was awarded to having the equipment relocated and ready for production. The following is an overview of the completed work:

  • Gutted the entire manufacturing area and provided an entirely new floor plan of rooms and circulation corridors

  • Removed all HVAC systems in the manufacturing area and provided new HVAC units with VAV distribution and DDC controls

  • Modified the existing chiller plant for primary/secondary distribution and replaced the existing cooling tower to provide water-side economizer operation during the winter months

  • Modified/expanded the existing compressed air, domestic water, and sanitary drainage systems

  • Added a new process vacuum system with distribution

  • Added a nitrogen system on the exterior of the building and provided nitrogen gas piping distribution within the building

  • Added new process hot water and process waste systems

  • Removed and expanded the majority of the electrical distribution system

  • Provided new high-efficiency lighting throughout the entire building

  • Removed the existing fire alarm system and provided a new multiplexed fire alarm system

The project received support from the local economic development agencies and NYSERDA incentives for the use of energy efficient equipment and systems.

Project Details

Location

Henrietta, NY

Owner

Rochester Precision Optics, LLC

Construction Cost

$6M

Project Contact

Bruce Wallmann, PE