FLH Geneva General Hospital Expansion Commissioning

Erdman Anthony is providing commissioning services for the new Finger Lakes Health Geneva General Hospital’s Emergency Department and West Building Expansion as well as supporting existing hospital renovations. The expansion will be comprised of approximately 95,000 GSF and consist of a three-story addition which will house an emergency department, Operating Rooms, Procedure Rooms, Sub Sterile Rooms, Private Recovery Rooms, a Central Sterile area, and many patient care, diagnostic and laboratory support bays. A new central plant is also being constructed with boilers, chillers, cooling towers, domestic hot water and pumping distribution systems. The project is being constructed in 2 phases.

Commissioned systems will consist of the supporting mechanical HVAC systems (AHUs, energy recovery, boilers, chillers, exhaust fans, ductwork distribution and room pressure controls systems, pumping distribution systems), domestic hot water system, DDC controls and lighting controls. The requested commissioning services will follow the 2010 Facility Guidelines Institute’s (FGI) Guidelines as published by the American Society for Healthcare Engineering (ASHE) which has been adopted by the New York State Department of Health (NYSDOH) for healthcare facilities. Commissioning services are also focused on verification of NYSERDA incentive measures under NCP10446.

Commissioning services include general site observation of the constructed systems to verify compliance with the design intent, witnessing of select testing during construction and witnessing of manufacturer startups, a sampling verification of the testing, adjusting and balancing (TAB) results and a review and comment of the entire TBA report, development and orchestration of functional performance tests and trending analysis, issuance and tracking of all non-compliant issues throughout construction and acceptance testing, a review of the owner’s training and O&M documentation, verification of NYSERDA measures and completion of the NYSERDA Building Commissioning Certification and a summary commissioning report with supporting appendices.

Project Details

Location

Geneva, New York

Owner

Finger Lakes Health Geneva General Hospital

Completion

2014

Construction Cost

$20M

Project Contact

Rachel Stuckey, PE, LEED AP®, BEMP, CEA, EBCP
  • Rachel Stuckey, PE, LEED AP®, BEMP, CEA, EBCP
  • 585-427-8888 x 1055
Bookmark and Share