Xerox EA Toner Plant Expansion

Erdman Anthony provided fire protection engineering and design services for the $35 million, approximately 55,000-square-foot expansion of the existing emulsion aggregation (EA) toner plant on the Xerox campus in Webster, NY. Xerox was constructing two additions to the existing plant at the time, increasing the plant’s size from 100,000 square feet to 155,000 square feet.

The current five-story plant, which opened in 2007, is one of only a handful of its kind in the world. It features more than 25 miles of pipes and stainless-steel and includes more than 9,000 sensors that track information about temperature, humidity, air flow, and other variables. Xerox invested $100 million in the plant in original construction and upgrades. These were the first additions to the original structure.

Working with Xerox and FM Global Commercial Property Insurance engineers, Erdman Anthony surveyed the fire suppression systems, the water-supply information, and the hazard classifications of the existing plant and compared that information to the proposed building and process additions. The existing water supply involved a complex network of underground piping and pump stations that were evaluated to confirm that adequate flow and pressure would be available to supply the proposed additions. Using this information, Erdman Anthony proceeded with designing the extension of the existing automatic wet standpipe and sprinkler systems to the additions. The extension of these systems involved significant coordination with the existing process engineers and the structural engineers involved in the design of the additions.

Since the existing toner plant had to remain operational during the construction of the additions, the existing fire suppression systems needed to remain live at all times. This was achieved by preplanning tie-in work during predetermined shutdowns.

In addition to the coordination that occurred with the existing and new process work, there was extensive coordination with the structural engineers involved with the proposed additions. The structural steel members for the additions were ordered prior to the completion of the design of the rest of the plant, and there was a requirement that the piping for the automatic sprinkler systems be run through the webs of the structural steel beams on the lower two levels of the plant. This level of coordination was achieved through the use of 3D BIM design techniques and clash detection for both the structural steel and sprinkler piping.

Project Details

Location

Webster, NY

Owner

Xerox Corporation

Completion

2015

Construction Cost

$35 Million

Project Contact

Andrew Taylor, PE, FPE