Stringham Drive and Byron Road Pump Stations

Erdman Anthony provided survey, mapping, and design services to the Town of Batavia in connection with improvements to Sanitary Sewer District #1. The project included:

  • Replacement of two existing lift stations with a single consolidated lift station (150,000 gpd);

  • Installation of 4,720 feet of new 8-inch gravity sewer main;

  • 1,680 feet of new 12-inch gravity sewer main; and

  • 4,690 feet of new 8-inch sewer HDPE force main.  

The new lift station design included a duplex pump arrangement, a separate control building, and a full stand-by power generator. Pump selection required careful consideration of a wide range of flows (existing and projected 20 years), pumping against an unusually large total dynamic head. Design and layout of the new station and gravity piping required careful planning, as each existing lift station was to remain in service throughout the construction phase until the new station was tested and fully operational. Erdman Anthony also provided construction support services. The Town of Batavia provided construction inspection services.

Project Details

Location

Batavia, NY

Owner

Town of Batavia

Project Contact

Daniel Ziemianski, PE
  • Daniel Ziemianski, PE
  • 716-631-1241 x 1103