Representative Projects

South Cascade Drive/Miller Road Bridge over Cattaraugus Creek
Towns of Concord and Ashford, Erie and Cattaraugus Counties, NY

This project involved bridge-replacement design and construction on a New York State Design-Build Procurement. The bridge’s site, known as the Zoar Valley, is located about 60 miles south of Buf...  Read More

O'Connor Rd Realignment
O’Connor Road Realignment
Perinton, NY

Erdman Anthony provided preliminary and final design services as well as construction inspection services for the $1.48 million locally administered federal aid project. The project identified safety...  Read More

Diverging Diamond: I-590/Winton Road Interchange Modification
Rochester, NY

During the morning rush hour, the Winton Road exit off I-590 southbound would become extremely backed up. Motorists trying to access I-590 from Winton Road in the afternoon would likewise experien...  Read More

Frederick Douglass-Susan B. Anthony Memorial Bridge 1
Frederick Douglass-Susan B. Anthony Memorial Bridge
Rochester, NY

Erdman Anthony provided preliminary and final design services for the reconstruction of and capacity improvements to 3.5 miles of I-490, a major six-lane highway that bisects Rochester, including 20 ...  Read More

Hamburg Railroad Quiet Zones
Hamburg, NY

Erdman Anthony provided scoping, preliminary engineering, final design, and construction phase services for the establishment of two new quiet zones along the heavily traveled CSXT Buffalo Terminal S...  Read More

I-81 over Erie Canal and Oneida River
Oswego, NY

This $9 million bridge rehabilitation project involved a structural integrity evaluation report and preliminary and final design for a unique structure. The technical challenges of this project canno...  Read More

U.S. Routes 223/22 Lewistown Narrows
Juniata and Mifflin Counties, PA

Erdman Anthony provided preliminary engineering and final design services for improvements to a 6.5-mile section of US 22/322 (SR 0022, Sections A09, A10, and A11) as a major engineering subconsult...  Read More

Moshannon Creek Viaducts
Centre and Clearfield Counties, PA

Erdman Anthony provided preliminary engineering and final design for the rehabilitation of dual viaducts on I-80 over Moshannon Creek, more than 1,200 feet in length with piers up to 175 feet ...  Read More

I-83, Exit 18 Reconstruction
York County, PA

A design team led by Erdman Anthony was selected to study alternatives for improvements to the exits 18 and 19 interchanges on I-83 (SR 0083, Section 040) and develop the selected alternatives for ...  Read More

Lake Champlain 1
Lake Champlain Bridge Replacement
Crown Point, NY to Chimney Point, VT

Consulting engineer HNTB, retained to design the replacement structure, produced construction plans for bidding on March 17, 2010. HNTB’s design consisted of a 1,029-ft.-long steel multigirder ...  Read More

2009 Preventative Maintenance
Brighton, Greece, Gates, Henrietta and Penfield, NY

This project involved a $4.3 million pavement rehabilitation along nine county roads: Elmwood Avenue, Clover Street, Panorama Trail, S. Winton Road, Fetzner Road, Vintage Lane, Lee Road, Pixley Roa...  Read More

Dorset Road Improvement Project
Dorsey Road Improvement Project
Rochester, NY

For this Urban LAFA project, Erdman Anthony provided preliminary and final design for the reconstruction of 0.61 miles of a two-lane urban minor arterial from Mt. Read Boulevard to Dewey Avenue. ...  Read More

Johnsonville Bridge (CR 111 over the Hoosic River)
Pittstown, NY

This $4.6 million Locally Administered Federal Aid Project involved the replacement of a 195-foot-long single-span steel-truss bridge over the Hoosic River in Pittstown, Rensselaer County. Built in 18...  Read More

Auburn Arch Bridge Replacement 1
Auburn Arch Bridge Replacement
Schuylkill County, PA

Erdman Anthony completed preliminary engineering, final design, and construction consultation for replacement of the deteriorating Auburn Arch Bridge, a three-span reinforced concrete arch structure ...  Read More

Wood Road Bridge over Cohocton River
Campbell, NY

This locally administered federal aid project involved the rehabilitation of a historic truss bridge built in 1897. The bridge was a 207-foot, single-span wrought iron through truss bridge carrying...  Read More

Conrail Clearance Improvements
Pennsylvania & New Jersey

bridge locations in Pennsylvania and New Jersey. The Erdman Anthony team designed the raising or replacement of six bridges on a fast-track schedule to facilitate the shipping of double-stack inter...  Read More

Pinnacle Road Improvements
Pinnacle Road Improvements
Rush, NY

Erdman Anthony provided preliminary and final design for improvements along the 2.1-mile section of Pinnacle Road (CR 92) between Rush Town Line Road and the NYS Thruway (I-90). The improvements were...  Read More

Bates Road Reconstruction
Bates Road Reconstruction
Medina, NY

The Town of Shelby’s project involved reconstruction of Bates Road to improve the roadway's structural integrity. Improvements were needed to accommodate industry along the corridor, which incl...  Read More

Fort Niagara Entrance Trestle Structural Rehabilitation
Niagara Falls, NY

The Niagara Regional Office of the New York State Office of Parks, Recreation, and Historic Preservation (NYSOPRHP) requested that Erdman Anthony evaluate the condition of a timber trestle bridge w...  Read More

Maine's I-95 Twin Bridges, Town of Etna
Etna, ME

  • Designed in three short months

  • Replacement bridges 78-foot long; 40-foot wide composite steel plate girder superstructures

    ...  Read More

Military Road Bridge over Mill Creek
Sackets Harbor, NY

Erdman Anthony provided in-depth bridge inspection, survey and mapping, and comprehensive design services for the rehabilitation of the Military Road Bridge over Mill Creek. This locally administered...  Read More

Cedar Street Reconstruction
Batavia, New York

Cedar Street is a one-mile-long urban collector located on the southeast side of Batavia. It links two arterial state highways, NY Route 5 (Main Street) on the north and NY Route 63 (Ellicott Street)...  Read More

Ski Bowl Road Bridge Replacement
Hunter, NY

This locally administered federal aid project involved replacement design for the Ski Bowl Road Bridge over the Schoharie Creek. The existing 119-foot, single-span welded steel through-truss struct...  Read More

Niagara Sheets Industrial Spur
Wheatfield, NY

Preliminary and final site plans were prepared for the $8 million Shawnee Road plant cardboard corrugating facility expansion. The facility was served by an industrial spur constructed in the...  Read More

US Route 219 Arch Bridges near Ashford, NY, between Cattaraugus County and Erie County
Cattaraugus, NY

Erdman Anthony was retained by arch erector Cornell and Company, a subcontractor to Cold Spring Construction on this $85 million project. The goal was to have Erdman Anthony prepare erection plans ...  Read More

Rensselaer Rail Station
Rensselaer, NY

Erdman Anthony was part of the engineering team for a new passenger rail station, boarding facilities, track improvement, and multi-level parking garage in Rensselaer, NY. The 67,000-square-foot, f...  Read More

Hunts Point Distribution Center Redevelopment
Bronx, NY

The Hunts Point Terminal Market is one of the largest produce distribution centers in the world; supplying 3.3 billion pounds of fruits and vegetables a year, worth over $2 billion, to more than 10...  Read More

Coastal Zone Roadway Turtle Lighting
South Florida, FL

Erdman Anthony was contracted by Florida Department of Transportation (FDOT) District 4, Planning and Environmental Management Office, to develop alternative roadway lighting design standards for c...  Read More

SR A1A/Ocean Blvd. (Palm Beach County Line to SR 800/Spanish River Blvd.)
Boca Raton, FL

Erdman Anthony provided highway design and land surveying services for SR A1A, a 4.8-mile 3R project. The project involved minor widening, drainage improvements, and specialized lighting to accommoda...  Read More

Main Street US 20A/NY 78 Reconstruction (East Aurora)
East Aurora, NY

Erdman Anthony provided design services for the reconstruction of 1.3 miles of highway, including the drainage system along U.S. Route 20A/state Route 16/state Route 78, and Main Street between the...  Read More

Main Street and Washburn Street
City of Lockport

Erdman Anthony designed the complete rehabilitation of Main Street, East Avenue, and Washburn Street that will aid in the revitalization of the downtown area, attract additional commercial developm...  Read More

Forest Home Bridge 1
Forest Home Drive Bridge Rehabilitation
Ithaca, NY

This locally administered federal aid project involved the rehabilitation of a historic steel truss bridge carrying Forest Home Drive over Fall Creek in the Town of Ithaca. Erdman Anthony provided ...  Read More

I-490 Western Gateway Project (from the Erie Canal to Genesee River)
Rochester, NY

Erdman Anthony provided preliminary and final design services for reconstruction and capacity improvements along 3.5 miles of I-490, a major six-lane highway that bisects Rochester, including 20 ...  Read More

Route 26 Interstate 99 Design
Centre County, PA

Erdman Anthony served as prime consultant for this project, which begins at the US 322 interchange with Park Avenue, adjacent to the Penn State University Research Park and Beaver Stadium, and exte...  Read More

Juniata River Bridge Replacement 1
Juniata River Bridge Replacement
Juniata County, PA

Erdman Anthony led the consultant design team that provided preliminary engineering, final design, and construction consultation for the $16.9 million Juniata River Bridge Replacement project in Juni...  Read More

SR 116 Bridge over the Mattamiscontis Stream
Augusta, ME

Erdman Anthony provided preliminary engineering for the replacement of the SR 116 bridge over the Mattamiscontis Stream. This project involves a 101-ft.  single-span plate girder on integ...  Read More

Rte. 5, Main Street
Buffalo, NY

Erdman Anthony provided design and construction inspection services for the $30 million reconstruction of Main Street from Bailey Avenue (US 62) to the Scajaquada Expressway (SR 198) in the City o...  Read More

Routes 31, 31A, 31E, and 63
Medina, NY

Erdman Anthony provided scoping, design services, and construction inspection services for the reconstruction of Routes 31, 31A, 31E, and 63, including Main Street (Center Street to West Avenue) an...  Read More

US 7 Improvements
South Burlington, VT

Erdman Anthony performed the planning and design services for the reconstruction of a 3.4-mile section of US 7 (Shelburne Road). Key project features included the inspection of several cross c...  Read More

Upper Black Eddy- Milford Bridge Rehabilitation
Bucks County, PA

Erdman Anthony provided a concept study, preliminary design, final design, and post-design services for the rehabilitation of a 700-foot, three-span Warren truss bridge over the Delaware River betw...  Read More

I-80 Interchanges
Centre County, PA

Erdman Anthony provided final design services for this interchange and expressway reconstruction project as a major engineering subconsultant. The project involves construction of two new interchan...  Read More

I-81, St. Mary's Cemetery Bridges
Scranton, PA

Erdman Anthony provided preliminary engineering, final design plan reviews, and construction consultation services for the design/build replacement of dual bridges, 383 feet and 480 feet in length,...  Read More

SR806AtlanticAve1
SR 806/Atlantic Avenue from SW 12th Avenue to SR A1A
Delray Beach, FL

This resurfacing project for a 1.2-mile section of SR 806/Atlantic Avenue through an urban and commercial downtown area of Delray Beach includes median modifications and pedestrian upgrades in addi...  Read More

SR 786 (PGA Boulevard)/ SR 811 (Alt A1A)
Palm Beach Gardens, FL

Erdman Anthony was invited to provode design and highway lighting plans for the proposed urban interchange at PGA Blvd. and Alt A1A. The project included decorative street lighting on the PGA overp...  Read More

SR A1A from NE 18th Street to Oakland Park Boulevard
Ft. Lauderdale, FL

Erdman Anthony provided land surveying, and roadway design services on this 1-mile 3R project consisting of milling and resurfacing, sidewalk/ADA construction, signing and pavement marking, street ...  Read More

Districtwide Paving Analysis, Loxahatchee Groves Water Control District
Loxahatchee, FL

This project required a report providing criteria, concepts, and cost estimates for the paving of the primary roadways within the Loxahatchee Groves Water Control District. Alternative pavemen...  Read More

Route 15 (Broadway Street)
Bangor, ME

Erdman Anthony provided preliminary and final design services for the rehabilitation and widening from four to five lanes of an urban principal arterial through a highly commercialized district of ...  Read More

NYS Route 17 I-81 Interchange
Binghamton, NY

The firm was part of a joint venture to assess various interchange alternatives that would improve the geometric, structural, and operational deficiencies of the Rte 17/I-81 interchange in the City...  Read More

Clinton Avenue Pedestrian Access Bridge
Rochester, NY

During the preliminary design phase for this project, community members voiced several concerns. Their number one concern was for pedestrian safety. Through a tremendous amount of community involve...  Read More

Haverhill Road Intersection Analysis
Lantana, FL

Erdman Anthony provided intersection analysis, roadway design, and engineering survey services required in connection with the construction of Haverhill Road from Hypoluxo Road to the L-17 canal, a...  Read More

Kenney Place - A Connector Road
Perinton, NY

Perinton had received complaints from residents for several years about safety concerns relative to exiting Chardonnay Drive onto Pittsford-Palmyra Road (NYS Rt. 31). Because there are traffic sign...  Read More