Erdman Anthony provided construction plans and specifications and construction observation for the cleaning, patching, and resurfacing of sections of SW 209th Avenue, SW 50th Street, SW 210th Terrace, and SW 208th Lane in Southwest Ranches, Florida. The project also included full-depth reconstruction of a section of SW 54th Place, east of SW 208th Lane.

Additional aspects of the project included:

  • Regrading the roadside swales to establish wide, shallow swales with a flat grade, allowing lateral flow of stormwater and eliminating the need to reconstruct existing driveways 
  • Minor widening of curves on SW 50th Street
  • Restriping the south leg of Griffin Road at its intersection with SW 209th Avenue