Erdman Anthony provided lighting, signalization, signing and pavement markings for an FDOT safety improvement project on Stirling Road at the I-95 Interchange in Broward County. The six-lane divided urban minor arterial roadway has curbs, gutters, and sidewalks on both sides and a posted speed limit of 45 miles-per-hour.
This section of Stirling Road had been a high-crash segment. A study by FDOT in 2013 identified safety-related issues and recommended countermeasures, including lighting improvements, to address them. New low-height light poles were installed to avoid conflicts with the existing overhead power lines. The pedestrian signals for one of the ramp crossings also were upgraded.